landslide control

滑坡防治

常用释义

词性释义

滑坡控制;滑坡防治
例句
  • 全部
1·The main content concludes:(1) the problems existing in landslide control at the present;
主要内容包括:(1) 目前滑坡防治中存在的问题;
2·In the design of landslide control engineering, the effect of traffic loads has not been taken into account.
当前滑坡防治工程设计中,没有考虑汽车荷载对滑坡稳定性影响。
3·It is pointed out that underground drainage engineering should be the main measure in pebbly-clay landslide control.
指出在含碎石黏性土滑坡的防治中,应将地下水排水措施作为主要防治措施。
4·The lattice beam and anchor pipe grouting composite structure is an effective engineering measure in landslide control.
格构梁与锚管注浆复合结构是治理滑坡的一种有效措施。
5·As an effective measure in landslide treatment in engineering, anti-slide pile plays a significant role in world landslide control.
抗滑桩作为治理滑坡的有效工程措施,在世界各国滑坡治理中占有重要的地位。
6·Landslide monitoring is the basis of landslide control first midst and last, and its effect need to be verified by landslide monitoring.
在滑坡治理的过程中,滑坡监测始终是滑坡防治的基础,防治的效果也需要监测工作来检验。
7·Strengthen a research on groundwater characteristics is conductive to determination of stability and development trend of the Baota landslide and can provide basis for the landslide control.
因此,加强对地下水特征的研究有助于确定宝塔滑坡的稳定性现状、发展趋势,为有针对性地提出防治对策提供依据。
8·Then, using the Fuzzy Theory, a comprehensive evaluation model of the post evaluation is set up for the first time, which lays a foundation for establishing the criterion of landslide control.
进而采用模糊数学理论,建立了滑坡防治工程效果的模糊综合评判模型。
9·And combine control mining method, surface subsidence preplan theory, mining landslide area disaster forecast and numerical simulation studied out controlling mining estimate measure.
并结合控制开采方法、煤柱稳定性分析、地表沉陷预计、采动滑坡区灾害预测理论以及数值模拟确定了控制开采的评价方法。
10·Both in 2004 and today just under 40% of people think it is in "excellent" or "good" shape: a far higher share than in 1994, when control of Congress changed hands in a Republican landslide.
无论是在2004年还是今天只有不到40%的人认为经济状况“优秀”或“良好”。当1994年共和党获得压倒性胜利,国会控制权易手时,这个比例要低得多。