1·Prepare the work breakdown structure.
准备工作分解结构。
2·D lack of a clear work breakdown structure.
缺少一个清晰的工作分解结构。
3·A work breakdown structure (WBS) is defined.
定义工作分解结构(WBS)。
4·Defines and tracks project plan and work breakdown structure.
定义并追踪项目计划与工作分解结构。
5·A work breakdown structure (WBS) is used on every project.
工作分解结构(WBS)用于每个项目中。
6·It includes a Work Breakdown Structure illustrated with activity diagrams.
它包括使用活动图进行说明的工作分解结构。
7·Drafting a work breakdown structure (WBS) as the basis for a project schedule.
草拟以项目计划为基础的工作故障结构(WBS)。
8·Project Management; Network scheduling; work Breakdown Structure; Pull Plan.
项目管理;网络计划;任务结构分解;拉动计划。
9·Tasks at a high level such as "Build QA Environment" are OK for a work breakdown list.
“构建QA环境”等高级别任务可以采用工作划分列表。
10·The example "Agile Kanban" in Figure 5 is a work breakdown, and it works well within the team.
图5中“敏捷看板”的例子是一个工作的分解,它在团队内部工作良好。