月亮词典
首页
查询
adit
英音[ ˈædɪt ] 美音[ ˈædɪt ]
坑道
常用释义
词性释义
n.
入口;平坑
例句
全部
坑道
a
tunnel
horizontal
to the
surface
leading
to a
mine
is
called an
adit
.
与地表平行通向井下的坑道是平峒。
Adit
Ginde
of
the
University
of
Colorado
Denver
,
one of the
researchers
,
said
in
a
statement
.
丹佛科罗拉多大学的研究人员博士艾迪·金德在一份声明中说道。
Window
of such
an
adit
pants
and
T-
shirts
indicate
that
people
live
here
.
一个洞穴的窗户。裤子和衬衫表明这里有人居住。
The
results
are
helpful
for
designing
and
construction
of intersection of main
tunnel
and
adit
in major
highway
tunnel
.
研究结论对长大公路隧道设计、施工横通道,有一定参考价值。
With
the progress of the
mining
operation in Lanjian
Iron Ore
year
on
year
the
effect
of
blasting
vibration
on
safety
of
adit
is
increasing
.
随着兰尖铁矿采场水平逐年下降,爆破震动对平硐的安全影响日益突出。
The
effect
of the
blasting
of
production
on
main
transported
adit
was
analyzed
at
Nanfen
Iron
Open
-pit
Mine
.
分析了南芬露天铁矿生产爆破对主运输平硐的影响。
The
development
systems
are the
adit
and
pass
above
4100m
level
,
and
underground
shaft
under 4100m
.
4100m以上选用平硐溜井开拓系统,4100m以下选用盲竖井开拓系统。
Control
of the
Side
-
pressure
in Strike-
adit
and its
Reinforcing
Measures
沿脉巷道侧压控制及加固措施
Underground
Excavation
Conversion
Technology
for Entering
Main
Construction
through
Subway
Large
Adit
地铁特大风道进主体暗挖施工转换技术
Effect
of
Blasting
Vibration
on
Stability
of
Adit
of Dirt
Haul
and
Its
Comprehensive
Regulations
爆破震动对废石运输平硐稳定性的影响与综合治理
A
Feasibility
Study
on
Prolonging
the
Service
Life
of
the
290
Level
Adit
in Nanfen
Surface
Mine
南芬露天矿延长290平硐服务年限的可行性研究
Study
on
tunnel
construction
mechanics
at
intersection
of
horizontal
adit
and
major
tunnel
in
highway
公路长隧道与横通道空间斜交结构施工力学研究
TBM
roadway
ripping
machine
used
in
adit
construction
TBM岩巷掘进机在平峒施工中的运用
Research
on
Allowable
Peak
Particle
Vibration
Velocity
for
Transport
Adit
in
Blasting
in
Open
-
Pit
Mine
露天爆破运输平硐允许峰值质点振动速度的研究
Machinery
and
equipment
in construction
of
the
adit
of Wulong
tunnel
武隆隧道横洞工区机械设备的选型与配套
Building served
by
a
ground
-
source
heat
pump
system with
adit
water
source
利用坑道水的地源热泵工程
Estimation
of
Adit
Dirt
Volume
in
Longtan
Hydropower
Station
Dam
Area
龙滩水电站坝址区平洞结垢量的估算
Reasonable
layout
of
adit
in tunnel for
water
conveyance
project
of
Dahuofang
Reservoir
大伙房水库输水工程支洞的合理布局及设计
Study
on the
Adit
Stability
Under
Dynamic
Blasting
Load
爆破动载荷下平硐稳定性的研究
Application
of
cable
way
in
No.
5
Adit
construction
of Gaoqiao
hydropower station
索道在高桥水电站5号支洞施工中的应用
1·The measured adit water temperature verifies the predicted results and the system behavior proves desirable.
系统运行后,坑道水温度变化实测数据基本验证了预测结果,系统运行效果良好。
同义词
n.
入口;平坑
threshold
entry
portal
way in