1·A fire at a transformer station in Toronto has plunged parts of the Canadian city into darkness.
加拿大城市多伦多一座变电站发生火灾,使该市部分地区陷入黑暗之中。
2·This paper discusses the characteristics, structure and function classification of intergrated automation system of digital transformer station.
论述了数字化变电站综合自动化系统的特征、结构及功能划分。
3·Electric equipment, earthing device and lighting etc. for production equipments, circulating water field, area for tanks, transformer station, central control room and other places.
生产装置、循环水场、罐区、变电站、中控室和其他场所的电气设备、接地设施和照明等。
4·The cut to be excavated lies close to a large-scale transformer station. There are high voltage wires of more than 80 over the cut and several underground water pipes crossing with the cut.
待开挖的路堑临近大型变电站,路堑上空有80余条高压线,地下有多处输水管与路堑交叉。
5·The paper briefly introduces the PC104 bus standard and presents the design of software and hardware of an embedded DC control and monitoring device which is used in transformer station.
在简要介绍PC10 4总线标准的基础上,讨论了基于该标准的嵌入式变电站直流监控装置的软硬件设计。