1·An approximate position of the Huaiyin-Xiangshui fault has been determined on the basis of an analysis of data of drilling and shallow seismic prospecting in the urban area of Huaian City.
通过分析淮安城区内钻探和浅层人工地震勘探资料,确定了淮阴-响水断裂的大致位置。
2·This paper introduced the technology and achievements for example of No. 8 and No. 6 of An Wells in the Huaian Salt Mine.
以淮安盐矿区施工的安8井与安6井对接工程为例,简单介绍了该工程施工技术、工程成果,并总结出几点体会。
3·The characteristics of culvert laying project for pivot overpass in Huaian, the design and engineering process were introduced.
介绍了淮安枢纽立交地涵工程的特点、深井降水的设计及施工过程。
4·And Xuzhou, Lianyungang, Huaian three cities are apart from all about 100 kilometers, the land-and-water empty transportation convenience.
与徐州、连云港、淮安三市相距均在100公里左右,水陆空交通便捷。
5·Good morning (afternoon), Sir (lady). Welcome to Huaian Coach Station.
早上好(下午好),先生(女士),欢迎光临淮安汽车站。