1·The result of calculation manifests that the seepage state is improved and the storage capacity is enhanced after paving the composite geomembrane to the embankment dam.
计算结果表明,土石坝铺设复合土工膜后,改善了渗流情况,提高了蓄水能力。
2·This paper introduced the geomembrane horizontal seepage prevention measures at the upper reservoir basin at Tai an pumped storage power station, as well as treatments to construction defects.
介绍了泰安抽水蓄能电站上水库库盆采用的土工膜水平防渗措施及其施工缺陷处理,并对水库初期蓄水中的渗漏情况进行了简要的分析。