月亮词典
首页
查询
TGP
白芍总苷
常用释义
词性释义
abbr. 三峡工程(Three Gorges Project);白芍总苷(total glycosides of paeony)
例句
全部
白芍总苷
The
paper
has
analyzed
the
dynamometer
monitoring
result of
high
slope
anchor
cable
of
TGP
double-line
five
-
grade
ship lock
.
本文对三峡工程双线五级船闸高边坡锚索测力计监测资料进行了分析。
The
flood control
benefit
of the
TGP
is
the
greatest
contribution
to
the
improvement
of the eco-environment in the
middle
and
lower
reaches
.
三峡工程的防洪效益是它对长江中下游生态环境得以改善的最大贡献。
This paper
researches
the
reasons of
TGP
s banquette slumping during
river
closure
by the
Catastrophe
theory
and
Self
organized
criticality
.
从突变理论及自组织临界性理论,对三峡大江截流戗堤坍塌机理进行研究。
The
TGP
is
scheduled
to
expire
at the
end
of
this year
,
leaving
solar
projects
high and
dry
.
TGP预计今年年底就到期了,届时太阳能发电项目将再次陷入无助的困境。
Objective
To
observe
the
effect
of
total
glucosides
of
paeony
(
TGP
)
combined
with
methotrexate
(
MTX
)
on
rheumatoid
arthritis
(
RA
).
目的观察白芍总甙(TGP)联合甲氨蝶呤(MTX)治疗类风湿关节炎(RA)的疗效。
With water
extraction
and gel filtration
purification
,
a kind
of
polysaccharide
protein
conjugate
,
TGP
(
Tea
Glycoprotein),
was
prepared
.
用水提取茶叶并采用凝胶纯化,从茶叶中分离得到一种多糖蛋白复合物TGP。
It
took
nearly
100
years
from
conception
,
demonstration
,
design
,
construction
and
operation
to
final
completion
of
TGP
.
三峡工程从构想、论证、设计、建设至竣工全面投入运行历时近百年。
The
unsteady
changes
of
seepage
field
of
slope
of
TGP
ship lock
under
raining
and
percolation
are
analyzed
by
saturated
seepage
model
.
采用饱和渗流模型,对降雨入渗条件下三峡船闸边坡渗流场的非稳态变化情况进行了分析。
We observed the
sheet
-like
processes
typical
morphology
of
DCs
stimulated
by
TGP
.
树突状细胞经TGP诱导刺激后的树突状细胞形态越发典型;
By using the
sonic wave
and
the
seismic
wave
, the foundation
rock
holding
layer
on
-
spot
testing
of
TGP
has been
performed
.
应用声波及地震波对三峡工程坝基建基岩体持力层进行现场检测。
It
is
proved
that
one
year
ahead
of
the original schedule for the
third
-
stage
engineering
construction
of
TGP
is
feasible
.
最后结果表明,三峡三期工程施工提前一年是可行的。
Research
on
properties
of
wet
-
ground
fine
cement
slurry
used for
foundation
grouting
of
TGP
under
high pressure
三峡工程基础灌浆高压下湿磨细水泥浆材的性能研究
Selection
and
Verification of the
Structural
Pattern
of the
Penstock
and
Spiral
Case
of the
TGP
Power
-
station
三峡工程水电站压力管道和蜗壳技术结构型式的选择及论证
Prototype
observation
on
navigation
hydraulics
in
diversion
channel
of
TGP
during
construction
period
and
its
verification
on
model
三峡导流明渠施工通航原型观测与模型验证
Hydraulic
calculation
for
TGP
second
stage
cofferdam
construction
during
flood
period
and its actual verification
三峡工程二期围堰截流度汛期的水力学计算
Analysis
on
river
bed
evolution
of
dam
area
from the main
river
closure
to
open
diversion
channel
closure
of
TGP
三峡工程大江及明渠截流期间坝区河演分析
Research
on installing a
soft cushion
layer
for
placing
concrete
surrounding
the
spiral
case
of
TGP
powerplant
三峡电站蜗壳敷设软垫层浇筑外围混凝土研究
Concrete
construction
technology
for
spiral
case
of
TGP
power source
station
's
main
powerhouse
三峡电源电站主厂房蜗壳混凝土施工技术
Optimization
study
on the
length
of
upstream
floating
guide
wall of
TGP
's
shiplift
三峡升船机上游浮式导航堤长度优化研究
Reversion
analysis
of anti-shearing
strength
parameters
of
a
landslide
in
TGP
reservoir
area
三峡库区某滑坡抗剪强度参数的反演分析
Influence
of
TGP
impoundment
on
flowing
time
of the
Yangtze river
to the
estuary
三峡水库蓄水对长江进入河口流量时间的影响
Seepage
prevention
wall
constructed
with
high
pressure
jetting
for stage I
separation
levee
and its
cofferdam
at
TGP
三峡船闸下游隔流堤及施工围堰高喷防渗施工
Research
on
water
temperature
variation
of
TGP
reservoir
before
and
after
impoundment
and its
influence
三峡水库蓄水前后下泄水温变化及其影响研究
Threat
on
Bank
of Hanjiang
River
due to the
Impounding Water
of
TGP
and Its
Countermeasures
三峡水库蓄水对汉江堤防安全的威胁及防御对策
The
research
of the
navigation
and
diversion
in
TGP
channel
and
its
numerical
simulation
三峡工程明渠导流通航及数值实验研究概述
Construction
equipment
allocation
for
high intensity
backfilling
construction
of
upstream
separation
levee
of
TGP
三峡上游隔流堤高强度填筑施工设备配置
10
Years
of
supervision
on
TGP
construction
of the Yangtze river
长江三峡工程建设监理的10年实践
Preliminary
analysis of
uncertainty
in
quantitative
precipitation
forecast
of
TGP
reservoir
interval
area
三峡水库区间定量降水预报不确定性初探
Significant
Decision
for
Constructing
TGP
-
-
Review
of
Three
-
Generation
Leaders
of the
CPC
Showed
Concern
for
Constructing
TGP
三峡工程建设的重大决策--党的三代领导人关怀三峡工程建设的回顾
Preliminary
analysis
on
supervision
data of
foundation
deformation
of
TGP
Shiplift
during
construction
period
三峡工程升船机施工期基础变形监测初步分析
1·Conclusion TGP combined with low dosage methotrexate is effective and safe scheme on elderly onset rheumatoid arthritis.
结论白芍总苷联合较小剂量甲氨蝶呤治疗老年起病类风湿关节炎为有效、安全方案。