1·The apparatus of claim 3, wherein the first handle is connected to move in at least one degree of freedom with respect to the first cross beam.
该仪器索赔3,其中第一处理是连接到移动至少在一个自由度方面的第一次横梁。
2·The apparatus of claim 3, wherein the first handle is connected to move in rigid body motion with the first cross beam.
该仪器索赔3,其中第一处理是连接到移动刚体运动的第一次横梁。
3·The apparatus of claim 19, wherein the bracket is configured to pivot the handle in a third degree of freedom with respect to the first cross beam.
该仪器索赔19个,其中支架配置为支点的处理在第三自由度方面的第一次横梁。
4·Also many cross beam constructions and connecting conditions commonly used are listed.
列举了多种经常采用的横梁结构和连接情况。
5·Through analyzing and evaluating, it is proved that the connections of monolithic joint and track cross beam of Chongqing Caiyuanba Yangtze double-deck Bridge are reliable.
对试验结果和理论分析结果进行分析评价后,验证了重庆菜园坝长江大桥整体节点与轨道横梁连接的可靠性。