1·After running about 15-30 minutes, again until the leak fastening bolt to reach permitted.
运转约15 - 30分钟之后,再次紧固螺栓直至泄漏达到允许范围。
2·Rotor blade connection according to claim 1 wherein each intermediate layer of the individual dampers is fixed to the support beam structure by a single fastening point.
转子叶片方面,根据权利要求1,其中每一个中间层的个别阻尼器是固定的支持梁结构,由一个单一的紧固点。
3·Install the handbook, all assembling of complete fastening screw according to, read all above important safe explanation carefully please.
根据本安装手册,完全紧固所有的装配螺钉,请认真阅读以上重要的安全说明。
4·Secure cover with the fastening screws.
用紧固螺钉固定盖子。
5·Unscrew refrigerant line fastening screw for the compressor on the pressure damper.
旋下压力风门上压缩机的制冷剂管路紧固螺钉。