1·The countermeasures are put forward in view of the increasingly severe hazard of floating pollutants on the Bapanxia hydroelectric power station.
分析了漂浮污染物给八盘峡水电站带来的日益严重危害,提出了防范措施。
2·In the Chongqing Jiangkou Hydroelectric Power Station, dam foundation stress cycle grows multitudinous bands, faults, limestone caves and other disadvantageous geological combination.
重庆江口水电站坝基应力范围内发育众多夹层、断层、溶洞等不利地质组合。
3·Simple method and establishment way were introduced in detail of high steep slope computation model of a hydroelectric power station.
详细介绍了某水电站高陡边坡计算模型的概化方法、建立方式。
4·The blasting parameter calculation of the technology is analyzed with the discussion on the rock excavation of the first foundation in next floodgate of Bailongtan hydroelectric power station.
结合百龙滩水电站下闸首基础石方开挖工程,详细介绍了该技术的爆破参数计算。
5·Introduces the project survey of the Liujiang safflower hydroelectric power station, the key position arrangement collectively.
介绍柳江红花水电站的工程概况,枢纽总体布置。