1·Rather than trying to go from a manual process right to a fully automated process, BPM can be applied successfully in an iterative manner, as shown by the example process in this article.
与从一个手动流程直接转移到一个完全自动化的流程相反,可以通过一种迭代式方法成功应用BPM,本文的示例展示了这一点。
2·This means that the requirements process needs to be tightly integrated with, and executed to the same timetable of, the iterative development of the solution.
这意味着需求过程需要被紧密的集成,按照与解决方案的迭代式开发同样的时间表运行。
3·You'll explore the design phase as an iterative, cyclical process of designing, prototyping, and evaluating design alternatives.
您会发现设计阶段是一个迭代式的循环过程,包括设计、构建原型和评估设计备选方案。
4·Implementing an Enterprise MDM solution is an iterative process that requires the ability to deliver value to the business in incremental stages in order to meet the needs for all stakeholders.
实现企业MDM解决方案是一个迭代式的过程,要求能够以渐进方式为企业提供价值,满足所有参与者的需要。
5·Given the complexity and coordination requirements found in many SOA projects, it is not uncommon to see incremental or iterative development practices in use.
由于许多SOA项目中存在复杂性和协调需求,增量式或迭代式的开发实践并不少见。